Project Description
| Contractor | Faisal Electro-Mechanical Co. Ltd. |
| Location | Buraidah, KSA |
| End User | Power and Water Utility Co. for Jubail and Yanbu (Marafiq) |
| Client | Power and Water Utility Co. for Jubail and Yanbu (Marafiq) |
| Project Management | |
| Consultant | |
| Type of Project | Water & Power |
| Total Value (SAR) | 6.76 Million Saudi Riyal |
| Start Date | Sep, 2014 |
| Finish Date | Mar, 2015 |
| Total Land Area | |
| Total Built-up Area |
Work Description
Civil, Mechanical, Electrical and Instrument Work
Scope of Work
Pump House
-
- Design, Prepare and Excute the Construction Of Pump House Building about 18.6 mts (L) X 13.62 mts(W) X 10.5 mts(H)
- Construction of LV Switchgear Room in side Pump House Building about 18.6 mts (L) X 13.62 mts(W) X 10.5 mts(H)
- Supply and Installation of 2.5 Tons Electric Overhead Crane
- Supply & Installation of 3 nos of Pump w / Motor; Flow rate: 1000m³/h, Head: 40 mts (4 bar)
- Supply and Installation of Carbon Steel Pipes, Fittings & Flanges for Suction & Discharge Side of Pumps
- Supply and Installation of Valves for Suction & Discharge Side of Pumps
Valve Chamber
-
- Design, Prepare and Excute the Construction Of Flow Control By-Pass Valve Chamber about 8.1 mts (L) X 4.6 mts(W) X 3.85 mts(H)
- Supply and Installation of Flow Control, Butterfly Valve and Carbon Steel Pipes & Fittings for Valve Chamber