Design and Build of RO Expansion in Sudair Industrial and Business City – Modon Project

Project Description

MEP Contractor Faisal Electro-Mechanical Co. Ltd.
Location Sudair, Riyadh, KSA
End User
Client
Project Management
Consultant
Type of Project
Total Value (SAR) 17.38 Million Saudi Riyal
Start Date Dec, 2022
Finish Date Dec, 2023
Total Land Area
Total Built-up Area

Work Description

Site Work, Civil, Architecture, Structural, Mechanical, Electrical and Landscape Works.

Scope of Work

A – Site Construction

  • Construction of Building for Faculty of Dentistry,
  • Construction Concrete and wall works,
  • Construction finishing works, Hollow metal doors,windows and  frames,
  • Landscape works.

B – Electro-Mechanical Works

  • Air Handing Unit (AHU), Exhaust Fans (EF), HVAC works, Fire Fighting works ,
  • Power outlet works , Transformer , Ring Main Unit (RMU), Motor Control Center (MCC)
  • MDB, Data and Telephone System, IP CCTV System,
  • Low Voltage & Medium Voltage Cables works and BMS System,
  • Conveying system elevators (4 pcs), Freight Elevator (1 pcs)
  • Total Area of Building and Landscaping: Faculty land on around 7100 m2 with 15.000 m2 construction area.

Burns Treatment Center (First Phase) in the New University Hospital

Project Description

MEP Contractor Faisal Electro-Mechanical Co. Ltd.
Location Dammam, KSA
End User Ministry of Higher Education
Client Imam Abdulrahman Bin Faisal University
Project Management University PM
Consultant University PM
Type of Project Hospital Building
Total Value (SAR) 15.1 Million Saudi Riyal
Start Date Apr, 2021
Finish Date Jul, 2023
Total Land Area 15,000 m2
Total Built-up Area 7,100 m2

Work Description

Site Work, Civil, Architecture, Structural, Mechanical, Electrical and Landscape Works.

Scope of Work

A – Site Construction

  • Construction of Building for Faculty of Dentistry,
  • Construction Concrete and wall works,
  • Construction finishing works, Hollow metal doors,windows and  frames,
  • Landscape works.

B – Electro-Mechanical Works

  • Air Handing Unit (AHU), Exhaust Fans (EF), HVAC works, Fire Fighting works ,
  • Power outlet works , Transformer , Ring Main Unit (RMU), Motor Control Center (MCC)
  • MDB, Data and Telephone System, IP CCTV System,
  • Low Voltage & Medium Voltage Cables works and BMS System,
  • Conveying system elevators (4 pcs), Freight Elevator (1 pcs)
  • Total Area of Building and Landscaping: Faculty land on around 7100 m2 with 15.000 m2 construction area.

Medical Complex for Female Students – Medical Faculties in the University City (Dentistry Medicine Faculty)

Project Description

MEP Contractor Faisal Electro-Mechanical Co. Ltd.
Location Dammam, KSA
End User Ministry of Higher Education
Client Imam Abdulrahman Bin Faisal University
Project Management University PM
Consultant
Type of Project Hospital Building
Total Value (SAR) 61.68 Million Saudi Riyal
Start Date May, 2019
Finish Date May, 2022
Total Land Area 15,000 m2
Total Built-up Area 7,100 m2

Work Description

Site Work, Civil, Architecture, Structural, Mechanical, Electrical and Landscape Works.

Scope of Work

A – Site Construction

  • Construction of Building for Faculty of Dentistry,
  • Construction Concrete and wall works,
  • Construction finishing works, Hollow metal doors,windows and  frames,
  • Landscape works.

B – Electro-Mechanical Works

  • Air Handing Unit (AHU), Exhaust Fans (EF), HVAC works, Fire Fighting works ,
  • Power outlet works , Transformer , Ring Main Unit (RMU), Motor Control Center (MCC)
  • MDB, Data and Telephone System, IP CCTV System,
  • Low Voltage & Medium Voltage Cables works and BMS System,
  • Conveying system elevators (4 pcs), Freight Elevator (1 pcs)
  • Total Area of Building and Landscaping: Faculty land on around 7100 m2 with 15.000 m2 construction area.

Construction and Equipping of Environmental Safety and Control Department Building (ESCD)

Project Description

MEP Contractor Faisal Electro-Mechanical Co. Ltd.
Location Yanbu, KSA
End User Royal Commission for Jubail and Yanbu
Client Royal Commission for Jubail and Yanbu
Project Management Parsons
Consultant Parsons
Type of Project Building
Total Value (SAR) 49.32 Million Saudi Riyal
Start Date Dec, 2018
Finish Date Dec, 2020
Total Land Area
Total Built-up Area

Work Description

Electrical & Mechanical works

Scope of Work

Site Civil and Mechanical Works:

  • Site preparation, construction of roads, potable and fire water distribution system, irrigation system and landscaping works.

Site Electrical Power Distribution System and Telecommunication:

  • Supply, delivery, erection, test and commission of package substation, medium voltage cabling, grounding system and construction of telecom duct banks, handholes as per contract drawing.

Environmental Safety & Control Department Building:

  • Construction of ESCD Building consist of implementation of civil, structure and architecture work, mechanical works and electrical works.
  • Construction of Pump Room beside the ESCD Building consisting of civil works, mechanical works and electrical works.

P&C Of District Cooling Plant in Community Area

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Jubail, KSA
End User Royal Commission for Jubail and Yanbu
Client Royal Commission for Jubail and Yanbu
Project Management
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 159.73 Million Saudi Riyal
Start Date Jan, 2018
Finish Date Aug, 2020
Total Land Area
Total Built-up Area

Work Description

Civil, Electrical & Mechanical works

Scope of Work

Site Infrastructure Works

  • Storm Water Piping System: 800 m.
  • Potable and Fire Water Piping System: 700 m.
  • Sanitary Water Piping System: 500 m.
  • Break Water Storage Steel Tank: 1 no. 6 m dia. Capacity 150 m³.
  • Potable Water Storage Steel Tank: 1 no. 9 m dia. Capacity 400 m³.
  • Make-Up Water Storage Steel Tanks: 2 nos. 14 m dia. Capacity 2,275 m³.
  • Thermal Energy Storage Steel Tank: 1 no. 23 m dia. Capacity 24,000 ton/hr.

Chiller Plant

  • Electric Operated Overhead Cranes: 2 nos. Lifting Capacity 15 ton.
  • Series Counter Flow Water Cooled Centrifugal Chillers: 6 nos. Capacity 3,000 TR each (TOTAL 18,000 TR).
  • Induced Draft Field Erected Counter Flow Cooling Towers: 3 nos. Capacity 12,400 GPM.
  • Chilled Water Pumps: 3 nos. TDH 3 bar, Capacity 9,000 GPM.
  • Condenser Water Pumps: 3 nos. TDH 4 bar, Capacity 9,000 GPM.
  • MV Switchgears: 2 nos. 4.16 kV and 3 nos. 13.8 kV
  • Diesel Generator: 1 no. 300 kVA

Pump Stations

  • Make-Up Water Pumps: 4 nos. TDH 2 bar, Capacity 376 GPM
  • Fire Pumps: 2 nos. TDH 9 bar, Capacity 750 GPM
  • Submersible Pumps: 2 nos. TDH 3.5 bar, Capacity 1,200 GPM
  • Excavation and Backfilling
  • Expansion Tanks
  • Basket Strainers
  • Firefighting FM200 Clean Agent System
  • Air Handling Units, Package Units, Fan Coil Units and Exhaust Fans
  • Chemical Treatment System
  • Access Control System & SCADA
  • Area Lightning System
  • Telecommunication System

Infrastructure for KFU Teaching Hospital Project in Al-Ahsa, Phase-2

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Al Ahsa, KSA
End User Ministry of Higher Education
Client King Faisal University
Project Management KFU-PM
Consultant Al-Saif Consultants
Type of Project District Cooling & Infrastructure
Total Value (SAR) 245.21 Million Saudi Riyal
Start Date Mar, 2015
Finish Date June, 2021
Total Land Area 1,000,000 m2
Total Built-up Area

Work Description

Civil, Electrical & Mechanical works

Scope of Work

Site Infrastructure

  • Excavation: 250,000 m³
  • Backfilling: 450,000 m³
  • Concrete Works: 10,000 m³
  • Precast Fence Wall: 3,000 m
  • Asphalt: 150,000 m²
  • Chilled Water Piping System: 1,000 m
  • Steam and Condensate Water Piping System: 2,000 m
  • Sewerage Piping System: 4,500 m
  • Potable Water Piping System: 5,000 m
  • Raw Water Piping System: 5,000 m
  • Fire Water Piping System: 4,000 m
  • Storm Water Piping System: 2,000 m
  • Irrigation Water Piping System: 6,000 m
  • Deep Well: 4 nos. 250 m
  • Deep Well Water Piping System: 1,000 m
  • Manholes: 110 nos. FRP
  • Water Steel Storage Tanks: 6 nos. Capacities 3,000 m³ each
  • LV, MV and Communication Ductbank: 13,000 m
  • Cabling: 33,000 m
  • Transformers and Substations: 26 nos up to 2,000 kVA
  • External Area Lightning: 950 nos.
  • Reverse Osmosis (RO) Plant: 750 m³/day

Generator Plant

  • Diesel Generators: 11 nos. 2,500 kVA
  • Underground Diesel Tanks: 3 nos. Capacity 40,000 Gallon

Chiller Plant 

  • Water Cooled Centrifugal Chiller: 2 nos. Capacity 2,151 TR each (TOTAL 4,302 TR)
  • Air Cooler Radiators: 16 nos. 269 TR
  • Lift Stations: 13 Nos., capacity of 8-12 m depth
  • Steam Calorifiers: 10 nos., 1600-5400 L
  • Heat Exchanges: 11 nos., 1675 kW & 1805 kW
  • Condensate Recovery Unit: 2 nos., 200 L each