Project Description
| Contractor | Faisal Electro-Mechanical Co. Ltd. |
| Location | Dammam, KSA |
| End User | Ministry of Higher Education |
| Client | Imam Abdulrahman Bin Faisal University |
| Project Management | University PM |
| Consultant | |
| Type of Project | District Cooling & Infrastructure |
| Total Value (SAR) | 27.86 Million Saudi Riyal |
| Start Date | May, 2018 |
| Finish Date | Sep, 2020 |
| Total Land Area | |
| Total Built-up Area |
Work Description
Civil, Electrical & Mechanical works
Scope of Work
- Water Cooled Centrifugal Chillers: 3 nos. Capacity 1,300 TR each (TOTAL 3,900 TR)
- Mechanical Draft Cooling Towers Open Type: 4 nos. Capacity 3,900 GPM
- Filtration System: 20 nos. Capacity 54 m³/hr
- Automatic Sand Trap Filters: 20 nos. Rang between 0.35 mm – 1.2 mm
- Chilled Water Pumps: 3 nos. TDH 7 bar, Capacity 3,900 GPM
- Condenser Water Pumps: 3 nos. TDH 3.5 bar, Capacity 3,900 GPM
- Standby Diesel Generator: 1 nos. 1,500 kVA
- Transformer, Ring Main Unit, Low Voltage Switchgear, Motor Control Center (MCC) installation, Aboveground & Underground chilled water piping including valves and fittings.