Aramco MFC Contract: Installation of New Fuel Gas Particulate

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Western & Northwestern Region, KSA
End User Saudi Aramco
Client Saudi Aramco
Project Management
Consultant
Type of Project
Total Value (SAR) 2.3 Million Saudi Riyal
Start Date
Finish Date
Total Land Area
Total Built-up Area

Work Description

NWC-SWCC Connection Points Bulk Meter Projects

Scope of Work

  • Construction of Flow Meter and Valve Chambers (160 No’s)
  • Supply & Installation of Isolation Valves (160 No’s)
  • Supply & Installation of Flow Meters (160 No’s)
  • Supply & Installation of GRP Kiosk & Units(160 No’s)
  • Supply & Installation of Electrical Panels for each GRP Kiosk
  • Supply & Installation of Carbon Steel Pipe & Fittings
  • Supply & Installation of Instrumentation & SCADA
  • CS Pipe Wrapping
  • Water Quality Monitoring Station
  • Internal & External FBE Coating on C.Steel Pipes & Fittings
  • Online Anlyzer/Water Quality Monitoring Station
  • Total Alkalinity Measurement/Water Quality Monitoring Station

Supply & Installation of Underground Chilled Water Network Piping at Saudi Cargo Terminal – KAIA DC Project, Jeddah

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location King Abdulaziz Int’l Airport (KAIA), Jeddah
End User SAL – Saudi Logistic Services
Client Saudi Tabreed District Cooling Company
Project Management AECOM
Consultant SNC-Lavalin
Type of Project Pipeline
Total Value (SAR) 12.5 Million Saudi Riyal
Start Date Dec, 2022
Finish Date May, 2023
Total Pipeline Length 3,500 LM
Total Built-up Area

Work Description

NWC-SWCC Connection Points Bulk Meter Projects

Scope of Work

  • Construction of Valve Chambers (12 No’s)
  • Supply & Installation of Isolation Valves (8 No’s)
  • Supply & Installation of Dismantling Joints (6 No’s)
  • Supply & Installation of Automatic Air Vents(4 No’s)
  • Supply & Installation of Washout Valves (6 No’s)
  • Supply & Installation of 24X14inch Hot-Tapping Connection
  • Supply & Installation of Pre-Insulated Carbon Steel Pipes (3,415 m)
  • Supply & Installation of Leak Detection System
  • Flushing, Passivation and Cleaning of the System

NWC-SWCC Connection Points Bulk Meter Projects

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Western & Northwestern Region, KSA
End User Saline Water Conversion Corporation (SWCC)
Client Saline Water Conversion Corporation (SWCC)
Project Management SWCC-PM
Consultant
Type of Project Water & Power
Total Value (SAR) 119.5 Million Saudi Riyal
Start Date Aug, 2021
Finish Date Jan, 2023
Total Land Area
Total Built-up Area

Work Description

NWC-SWCC Connection Points Bulk Meter Projects

Scope of Work

  • Construction of Flow Meter and Valve Chambers (160 No’s)
  • Supply & Installation of Isolation Valves (160 No’s)
  • Supply & Installation of Flow Meters (160 No’s)
  • Supply & Installation of GRP Kiosk & Units(160 No’s)
  • Supply & Installation of Electrical Panels for each GRP Kiosk
  • Supply & Installation of Carbon Steel Pipe & Fittings
  • Supply & Installation of Instrumentation & SCADA
  • CS Pipe Wrapping
  • Water Quality Monitoring Station
  • Internal & External FBE Coating on C.Steel Pipes & Fittings
  • Online Anlyzer/Water Quality Monitoring Station
  • Total Alkalinity Measurement/Water Quality Monitoring Station

Infrastructure & Electro-Mechanical Works for Wadi Al Hada Residential Compound

Project Description

MEP Contractor SASEL & FEMCO CONSORTIUM
Location Riyadh, KSA
End User Wadi Hanifah Real Est. Development
Client Wadi Hanifah Real Est. Development
Project Management Leman PM
Consultant SaudConsult
Type of Project Residential Compound
Total Value (SAR) 236 Million Saudi Riyal
Start Date May, 2019
Finish Date Feb, 2020
Total Land Area 250,000 m2
Total Built-up Area 150,000 m2

Work Description

Electrical & Mechanical works

Scope of Work

  • Residential compound of 549 units to be built on total land of around: 215,000 m2 with total build up area of around 150,000 m2 works as bellow:
  • Infrastructure work, Electrical and Mechanical works for Residential compound 549 units consisting of: 8no’s Villas 5 bedrooms duplex, 66no’s of 3 bed rooms duplex townhouse, 57no’s of 4 bedrooms triplex townhouse and 338 apartments distributed on 43 buildings. all these to be built on total land of around 215,000 m2 with total build up area of around 150,000 m2.
  • Work includes supply and install the following:
  • 4no’s of chillers 426kw/each
  • Pipes for chilled water, potable water, and firefighting network with required valves
  • Pipes and manholes for sewage system
  • Medium voltage cables network, low voltage cables network
  • 13no’s Oil Type Transformers
  • 5no’s RMU
  • Generators
  • MCC Panels
  • Fuel Tanks
  • BMS

Infrastructure for KFU Teaching Hospital Project in Al-Ahsa, Phase-2

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Al Ahsa, KSA
End User Ministry of Higher Education
Client King Faisal University
Project Management KFU-PM
Consultant Al-Saif Consultants
Type of Project District Cooling & Infrastructure
Total Value (SAR) 245.21 Million Saudi Riyal
Start Date Mar, 2015
Finish Date June, 2021
Total Land Area 1,000,000 m2
Total Built-up Area

Work Description

Civil, Electrical & Mechanical works

Scope of Work

Site Infrastructure

  • Excavation: 250,000 m³
  • Backfilling: 450,000 m³
  • Concrete Works: 10,000 m³
  • Precast Fence Wall: 3,000 m
  • Asphalt: 150,000 m²
  • Chilled Water Piping System: 1,000 m
  • Steam and Condensate Water Piping System: 2,000 m
  • Sewerage Piping System: 4,500 m
  • Potable Water Piping System: 5,000 m
  • Raw Water Piping System: 5,000 m
  • Fire Water Piping System: 4,000 m
  • Storm Water Piping System: 2,000 m
  • Irrigation Water Piping System: 6,000 m
  • Deep Well: 4 nos. 250 m
  • Deep Well Water Piping System: 1,000 m
  • Manholes: 110 nos. FRP
  • Water Steel Storage Tanks: 6 nos. Capacities 3,000 m³ each
  • LV, MV and Communication Ductbank: 13,000 m
  • Cabling: 33,000 m
  • Transformers and Substations: 26 nos up to 2,000 kVA
  • External Area Lightning: 950 nos.
  • Reverse Osmosis (RO) Plant: 750 m³/day

Generator Plant

  • Diesel Generators: 11 nos. 2,500 kVA
  • Underground Diesel Tanks: 3 nos. Capacity 40,000 Gallon

Chiller Plant 

  • Water Cooled Centrifugal Chiller: 2 nos. Capacity 2,151 TR each (TOTAL 4,302 TR)
  • Air Cooler Radiators: 16 nos. 269 TR
  • Lift Stations: 13 Nos., capacity of 8-12 m depth
  • Steam Calorifiers: 10 nos., 1600-5400 L
  • Heat Exchanges: 11 nos., 1675 kW & 1805 kW
  • Condensate Recovery Unit: 2 nos., 200 L each