Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Buraidah, KSA
End User Power and Water Utility Co. for Jubail and Yanbu (Marafiq)
Client Power and Water Utility Co. for Jubail and Yanbu (Marafiq)
Project Management
Consultant
Type of Project Water & Power
Total Value (SAR) 6.76 Million Saudi Riyal
Start Date Sep, 2014
Finish Date Mar, 2015
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical, Electrical and Instrument Work

Scope of Work

Pump House

    • Design, Prepare and Excute the Construction Of Pump House Building about 18.6 mts (L) X 13.62 mts(W) X 10.5 mts(H)
    • Construction of LV Switchgear Room in side Pump House Building about 18.6 mts (L) X 13.62 mts(W) X 10.5 mts(H)
    • Supply and Installation of 2.5 Tons Electric Overhead Crane
    • Supply & Installation of 3 nos of Pump w / Motor; Flow rate: 1000m³/h, Head: 40 mts (4 bar)
    • Supply and Installation of Carbon Steel Pipes, Fittings & Flanges for Suction & Discharge Side of Pumps
    • Supply and Installation of Valves for Suction & Discharge Side of Pumps

Valve Chamber

    • Design, Prepare and Excute the Construction Of Flow Control By-Pass Valve Chamber about 8.1 mts (L) X 4.6 mts(W) X 3.85 mts(H)
    • Supply and Installation of Flow Control, Butterfly Valve and Carbon Steel Pipes & Fittings for Valve Chamber