Project Description

MEP Contractor FEMCO & YUKSEL Consortium
Location Al Ahsa, KSA
End User Ministry of Higher Education
Client King Faisal University
Project Management University PM
Consultant Zuhair Fayez Partnership (ZFP)
Type of Project District Cooling & Infrastructure
Total Value (SAR) 600.95 Million Saudi Riyal
Start Date Aug, 2007
Finish Date Dec, 2011
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical, & Electrical Infrastructure Works for Four (4) Sub – Packages as detailed below

Scope of Work

  • Excavation & Backfilling: 428,000 m³ & 1,028,000 m³
  • Concrete Works: 50,000 m³
  • Asphalt Works: 325,000 m²
  • Chilled Water Piping System: 14,800 m
  • Sweet Water Piping System: 9,000 m
  • Sewage Water Piping System: 10,000 m
  • Storm Water Piping System: 13,500 m
  • Raw Water Piping System: 12,000 m
  • Reverse Osmosis (RO) Unit Capacity 3,500 m³/day
  • Sewage Treatment Plant Capacity 3,770 m³/day (2 duty + 1 standby)
  • Chiller Plant
  • Water Cooled Centrifugal Chillers (Multi Stage): 9 nos. Capacity 3,150 TR each (TOTAL 28,350 TR)
  • Evaporator Flow: 3,900 GPM,
  • Water Entering Temp. 58°F
  • Water Leaving Temp. 38°F”
  • Open Circuit Cooling Towers: 8 nos. Capacity 9290 GPM
  • Primary Chilled Pumps: 7 nos. TDH 13.7 bar, Capacity 3,877 GPM
  • Condenser Water Pumps: 7 nos. TDH 4.5 bar, Capacity 9,290 GPM
  • MV Switchgear 13.8 kV
  • Generator Plant
  • Emergency Generators: 2 nos. Capacity 1,000kVA each
  • Diesel Generators: 2 nos. Capacity 1000kW
  • Motor Control Centers (MCC)
  • Street Lighting
  • Panel Boards
  • Grounding and Lightning Protection
  • Pump Rooms
  • SCADA System controlling all campus utility buildings
  • BMS System controlling all Colleagues Building