Project Description
| MEP Contractor | FEMCO & YUKSEL Consortium |
| Location | Dammam, KSA |
| End User | |
| Client | Rikaz Development Company |
| Project Management | |
| Consultant | |
| Type of Project | District Cooling & Infrastructure |
| Total Value (SAR) | 11.2 Million Saudi Riyal |
| Start Date | Mar, 2005 |
| Finish Date | Aug, 2005 |
| Total Land Area | |
| Total Built-up Area |
Work Description
Sewage System consisting of Sewage Network & Lifting Stations
Scope of Work
- Supply & Installation of uPVC Pipes, diameter ranging from 150 to 400 mm.
- FRP Pipes from 200 to 800 mm dia. including Valves, Fittings, Inspection Chambers and Manholes.
- Excavation, De-Watering, Leveling, Back-filling, Compacting and Side Slope Protection.
- Construction of Lifting Station and Booster Lifting Station which includes
- Submersible Pumps, Motors, together with Discharge Pipes & Fittings, Check Valve, Gate Valve and Exhaust Ducts.
- Construction of: Fence, Gates, Walkways, Asphalting,
- Guard House, Generator Room, and Electrical Room.
- Architectural Works include Concrete Masonry Units,
- Elastomeric Membrane Roofing System,
- Steel Doors & frames, Aluminum Windows,
- Plastering, Painting, Tiling (interior & exterior) and Toilet Fittings.