Shuqaiq Desalination and Power Plant (Contracts No : 11/2/1/92)

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Client Saline Water Conversion Corporation (SWCC)
Location Shuqaiq, KSA
Total Value (SAR) 693,000 SAR
Start Date Jun, 2003
Finish Date Nov, 2003

Work Description

Industrial Maintenance

RO Maintenance Building at SWCC Jubail

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Jubail, KSA
End User Saline Water Conversation Corp. (SWCC)
Client Saline Water Conversation Corp. (SWCC)
Project Management
Consultant
Type of Project Building
Total Value (SAR) 3.3 Million Saudi Riyal
Start Date Dec, 2002
Finish Date Dec, 2003
Total Land Area
Total Built-up Area

Work Description

Construction of Workshop Building

Scope of Work

  • Civil, Elect., & Mech. Works for 1,000 sq. mtrs. Workshop building, including Structural Work.
  • Electrical Works include RMU Sub-station for 13.8 KV and Low Current System.
  • Mechanical Works include HVAC Works for 60 Tons Coolinf capacity.
  • Architectural finishing and Furniture Fit-in.

Hofuf Water Transmission System

Project Description

Main Contractor Rashid / KSB Fluid System Gmbh
Sub-Contractor Faisal Electro-Mechanical Co. Ltd.
Location Khobar, KSA
End User Saline Water Conversation Corp. (SWCC)
Client Saline Water Conversation Corp. (SWCC)
Project Management SWCC-PM
Consultant
Type of Project Water & Power
Total Value (SAR) 4.6 Million Saudi Riyal
Start Date Dec, 2002
Finish Date June, 2004
Total Land Area
Total Built-up Area

Work Description

Electro – Mechanical Installations and Testing & Commissioning Works

Scope of Work

Mechanical Work:

  • Installation of Pumps.
  • Installation of Surge Vessel and Surge Tank.
  • Installation of SVP Compressor Unit.
  • Fabrication & Installation of Pipes.
  • Installation of Wall Ducts for Drain Stations.
  • Installation of Butterfly Valves, Platform, & Ladder of the Vessel.

Electrical Works:

  • Instrumentation Works in OPS Pump Area.
  • Installation of OPS & EPWTS Interface.
  • SVP instrument Installation, Cabling & Termination
  • Elect. Installation for HOFUF Yard Shafts 2 & 3.

Preparation of Infrastructure for the University City in Dammam Phase 1, Utility Works. (King Faisal University Permanent Campus in Dammam)

Project Description

MEP Contractor FEMCO & YUKSEL Consortium
Location Dammam, KSA
End User Ministry of Higher Education
Client King Faisal University
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 90.98 Million Saudi Riyal
Start Date Sep, 2002
Finish Date Aug, 2005
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical, & Electrical Infrastructure Works

Scope of Work

  • Development of 77 Hectares area with Excavation / Filling of 774,300 cu.mtr. of soil, preparation of 2.60 KM of Slope Embankment.
  • Construction of Roads with 511 poles of street Lights, Walkways & Parking.
  • Construction of 2.75 KM of Storm Drainage System.
  • Installation of 3.47 KM of Irrigation Piping, and LPG Network of 1.94 KM with
  • Installation of two nos. LPG Tanks with total capacity of 46,000 gallons.
  • Setting-up of R.O. Plant of 600 cu. mtr. per day capacity with Water Well, and with 600 cu. mtr. Underground Water Tank,
  • 600 cu. mtr. Sweet Water Tank and 1800 cu. mtr. Raw Water Tank.
  • Also installed 8.96 KM of Water Distribution Network with pipe sizes ranging from dia.: 25 to 315 mm.
  • Setting-up of Sewage Treatment Plant of 1340 cu .mtr. per day capacity and Installation of 4.62 KM of Sewer Pipelines.
  • Installation of 3 Chiller Plants of 1,300 Tons capacity,
  • 3 nos. Cooling Towers of 3,900 GPM capacity & laying of 6.73 KM of underground Pipes, sizes ranging from 150 to 900 mm. dia.
  • 3 nos. of Chilled & Cond. Water Pumps, 8 nos.of AHUs, & 11 Exhaust Fans were installed.
  • Mech. Works also include packages of Storm Water Pumping Station and Sewer Pumping Station.
  • Construction of ‘Utility Building’ with facilities like: Telephone & Computer Data System, Clock System, MATV, CCTV surveillance,
  • CCMS / BMS / Fire Alarm System incl. Sprinklers, FM 200 Fire Suppression System & Fire Hydrants.
  • Electrical Works include: Installation of 26 KM of uPVC conduits for Elect. Cabling.
  • Emergency Electric Power Sub-station with 2 nos. of 1,500 KVA Generators, Power Transformers,
  • MV Switchgear of MVA / 13.8 MV capacity and Installation of 38.5 KM of 15 KV MV Cables.,
  • LV Switchgear, MCCs, Power & Lighting Panels, Lighting Transformers,
  • 14.7 KM LV Cables, Control Boards, and Photo-electric Switches for Street Lights.
  • Grounding, Bonding, and Lightning Protection System.

Jeddah Desalination and Power Plant (Contracts No : 8/1/1/2569)

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Client Saline Water Conversion Corporation (SWCC)
Location Jeddah, KSA
Total Value (SAR) 961,740 SAR
Start Date May, 2002
Finish Date Aug, 2002

Work Description

Industrial Maintenance

Shuqaiq Desalination and Power Plant (Contracts No : 11/1/1/2539)

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Client Saline Water Conversion Corporation (SWCC)
Location Shuqaiq, KSA
Total Value (SAR) 271,440 SAR
Start Date Dec, 2001
Finish Date Feb, 2002

Work Description

Industrial Maintenance

Jeddah Desalination and Power Plant (Contracts No : 8/1/1/2533)

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Client Saline Water Conversion Corporation (SWCC)
Location Jubail, KSA
Total Value (SAR) 339,120 SAR
Start Date Oct, 2001
Finish Date Dec, 2001

Work Description

Industrial Maintenance

SCC Export Terminal Project – Dammam Port

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Dammam, KSA
End User TIMCO
Client TIMCO
Project Management
Consultant
Type of Project Industrial
Total Value (SAR) 0.6 Million Saudi Riyal
Start Date Oct, 2001
Finish Date Feb, 2002
Total Land Area
Total Built-up Area

Work Description

Assembling and Erection of Cement Ship Loader

Scope of Work

  • Installation of Pipes of sizes : 2″,10″, & 12” for conveying Compressed Air
  • Installation of Cement Pumps
  • Installation of Cement Unloading Pipes of sizes: 12″, 14″, 20″, 22″, & 24“.

20 MIGD SWRO Plant Al-Jubail Link Line Project

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Client Saline Water Conversion Corporation (SWCC)
Location Jubail, KSA
Total Value (SAR) 1,600,000 SAR
Start Date Jun, 2000
Finish Date Nov, 2000

Work Description

Industrial Maintenance

Ibn Hayyan Plastic Products Factory Mech., Elect., HVAC, & Instrumentation Installation Works

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Jubail, KSA
End User Stork Alpha Sabic Group of Co.
Client Stork Alpha Sabic Group of Co.
Project Management
Consultant
Type of Project Industrial
Total Value (SAR) 36.8 Million Saudi Riyal
Start Date Feb, 1999
Finish Date Jul, 2000
Total Land Area
Total Built-up Area

Work Description

Elect., Mech., HVAC, Intstr. & Steel Structure Works for Ibn-Hayan Plastic Products Factory – consisting of:

  • Artificial Leather Plant (Production capacity: 8 million sq. mtr per annum).
  • Wall Cover Plant (Production capacity: 14 millions sq. mtr per annum).
  • Cellular Extruded Plant (Production capacity: 6,600 metric Tons per annum).
  • Construction of: Main In-Coming Substation & Utility sub station for Plant Load of 18 MVA.
  • Construction of: Central Warehouse, Utility area, Pipe Racks, Tank Farm Area and Gas Pipe Metering Skid.

Scope of Work

  • Erection of 2,000 MT of Fabricated Steel Structure, with Roof & Walls Cladding.
  • Installation of about 450 KM of Pipelines (for Process, Potable Water, Sanitary Industrial Waste, Cooling Water, and Compressed Air) including Hot & Cold insulation and Jacketing of Pipes.
  • Plumbing Works for Buildings. Supply, Fabrication, Installation, Testing & Commissioning of HVAC System
  • Installation of Chillers, Cooling Towers, Compressors, Pumps, Blowers, Air Handling Units, & Exhaust Fans.
  • Installation of Fire Fighting, Fire Alarm & FM 200 System.
  • Erection of All Mechanical & Electrical Machinery / Special Equipment for complete Plant.
  • Erection of Power Transformers, MV Switchgear, Generator, MCCs, UPS, etc.
  • Installation of All Lighting & Power Distribution Inst. & Control System.