Chilled Water Line – SWCC

Project Description

MEP Contractor Faisal Electro-Mechanical Co. Ltd.
Location Jubail, KSA
End User Saline Water Conversion Corporation (SWCC)
Client Saline Water Conversion Corporation (SWCC)
Project Management SWCC-PM
Consultant
Type of Project Water & Power
Total Value (SAR) 5.18 Million Saudi Riyal
Start Date May, 2019
Finish Date Feb, 2020
Total Land Area
Total Built-up Area

Work Description

Civil, Electrical & Mechanical Work

Scope of Work

  • Supply and Installation New GRV Pipes & Fittings
  • Supply and Installation of Power Pack for DN 900 Butterfly valves
  • Fabrication of GRP Pipe supports.
  • Civil Works; Concrete Work for Pipes Foundation, Asphalt Cutting, Excavation  and Back filling work

Infrastructure of University City (Phase 3) Rehabilitation of Cooling Towers

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Dammam, KSA
End User Ministry of Higher Education
Client Imam Abdulrahman Bin Faisal University
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 9.25 Million Saudi Riyal
Start Date Apr, 2019
Finish Date Apr, 2020
Total Land Area
Total Built-up Area

Work Description

Civil, Electrical & Mechanical works

Scope of Work

  • Water Cooled Centrifugal Chillers: 3 nos. Capacity 1,300 TR each (TOTAL 3,900 TR)
  • Mechanical Draft Cooling Towers Open Type: 4 nos. Capacity 3,900 GPM
  • Filtration System: 20 nos. Capacity 54 m³/hr
  • Automatic Sand Trap Filters: 20 nos. Rang between 0.35 mm – 1.2 mm
  • Chilled Water Pumps: 3 nos. TDH 7 bar, Capacity 3,900 GPM
  • Condenser Water Pumps: 3 nos. TDH 3.5 bar, Capacity 3,900 GPM
  • Standby Diesel Generator: 1 no. 1,500 kVA

Mechanical Works for Steam Boilers Network in Medical Center

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Jeddah, KSA
End User Ministry of Higher Education
Client King Abdulaziz University
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 8.1 Million Saudi Riyal
Start Date Nov, 2018
Finish Date Nov, 2020
Total Land Area
Total Built-up Area

Work Description

Civil, Electrical & Mechanical works

Scope of Work

  • Renovation of Boiler Building Replacement of doors and windows,
  • Plastering, painting, ceiling and roof insulation system works.
  • Replacement of (3) nos. Diesel type Steam Boiler
  • Supply, installation, testing & Commissioning of (2) nos. Electric type Steam Boilers and (1) no. Gas type Steam Boiler with steam capacity 1.5 ton/hr.
  • Rehabilitation of (2) nos. Steam Pumps.
  • Supply, installation, Testing & Commissioning of AHU & ducting,
  • RO Unit, Water Softener Unit, Pumps, pipe & fittings and valves,
  • Boiler Plant Fire Fighting System,
  • BMS, Main Distribution Board, cable and cable trays.
  • Underground existing High Pressure Steam Line Test (X-RAY and REPLICA)

Construction of Infrastructure for University City – Central Air Chillers (Phase 1)

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Dammam, KSA
End User Ministry of Higher Education
Client Imam Abdulrahman Bin Faisal University
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 26.08 Million Saudi Riyal
Start Date Nov, 2018
Finish Date May, 2020
Total Land Area
Total Built-up Area

Work Description

Civil, Electrical & Mechanical works

Scope of Work

  • Air Cooled Chillers: 8 nos. Capacity 500 TR each (TOTAL 4,000 TR)
  • Chilled Water Pumps: 10 nos. TDH 6.25 bar, Capacity 1,200 GPM
  • Chilled Water Piping System: 350 m, DN800, RTR/GRE, Underground
  • Expansion Tank & Air Separator
  • Split Units and Exhaust Fans
  • FM200 Firefighting System
  • Building Management Control System
  • Fire Alarm System
  • Grounding and Lightning System

Supplementation of Infrastructure for University City (Development of HVAC System)

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Dammam, KSA
End User Ministry of Higher Education
Client Imam Abdulrahman Bin Faisal University
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 27.86 Million Saudi Riyal
Start Date May, 2018
Finish Date Sep, 2020
Total Land Area
Total Built-up Area

Work Description

Civil, Electrical & Mechanical works

Scope of Work

  • Water Cooled Centrifugal Chillers: 3 nos. Capacity 1,300 TR each (TOTAL 3,900 TR)
  • Mechanical Draft Cooling Towers Open Type: 4 nos. Capacity 3,900 GPM
  • Filtration System: 20 nos. Capacity 54 m³/hr
  • Automatic Sand Trap Filters: 20 nos. Rang between 0.35 mm – 1.2 mm
  • Chilled Water Pumps: 3 nos. TDH 7 bar, Capacity 3,900 GPM
  • Condenser Water Pumps: 3 nos. TDH 3.5 bar, Capacity 3,900 GPM
  • Standby Diesel Generator: 1 nos. 1,500 kVA
  • Transformer, Ring Main Unit, Low Voltage Switchgear, Motor Control Center (MCC) installation, Aboveground & Underground chilled water piping including valves and fittings.

Infrastructure for the Preparatory Year in Faysaliyah

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Jeddah, KSA
End User Ministry of Higher Education
Client King Abdulaziz University
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 63.8 Million Saudi Riyal
Start Date Nov, 2017
Finish Date May, 2020
Total Land Area
Total Built-up Area

Work Description

Civil, Electrical & Mechanical works

Scope of Work

Work Summary: Infrastructure work for the existing and new building in Al Faysaliyah King Abdulaziz University Campus, work including all civil works and complete electro-mecanical work for chiller plant with mechanical and electrical net works as bellow:

  • Water Cooled Centrifugal Chillers: 11 nos. Capacity 560 TR each (TOTAL 6,160 TR)
  • Chilled Water Primary Pumps: 7 nos. TDH 3 bar, Capacity 2,300 GPM
  • Chilled Water Secondary Pumps: 7 nos. TDH 5 bar, Capacity 1,900 GPM
  • Expansion Tanks: 4 nos. Capacity 900 Gallon
  • Heat Exchangers: 11 nos. 1,750 kW
  • Aboveground and Underground Chilled Water Piping: 3,500 m
  • Sewage Piping System: 2,500 m
  • Potable and Fire Water Piping System: 2,500 m
  • Fire Pumps: 2 nos. TDH 6 bar, Capacity 317 GPM
  • Fire Pump: 1 nos. TDH 8 bar, Capacity 1,000 GPM
  • MV Switchgears: 4 nos. 13.8 kV
  • Transformers: 2 nos. 13.8 / 0.4 kV
  • Emergency Generator: 6 nos. 800 kVA

Infrastructure Works for Projects of King Abdulaziz University Northern Area – Wadi Jeddah

Project Description

MEP Contractor Faisal Electro-Mechanical Co. Ltd.
Location Jeddah, KSA
End User Wadi Jeddah
Client Wadi Jeddah
Project Management Fluor Consultants
Consultant Fluor Consultants
Type of Project District Cooling & Infrastructure
Total Value (SAR) 291.39 Million Saudi Riyal
Start Date May, 2016
Finish Date May, 2018
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical, Electrical and Instrument Work.

Scope of Work

  • Water Cooled Centrifugal Chillers: 12 nos. Capacity 2,185 TR each (TOTAL 26,220 TR)
  • Fluid Coolers draft type with dual axial fans and coils: 60 nos. fans total and 4.88 m dia.
  • Chilled Water Pumps: 12 nos. TDH 2 bar, Capacity 4,548 GPM
  • Condenser Water Pumps: 12 nos. TDH 3.5 bar, Capacity 7,147 GPM
  • Distribution Pumps: 6 nos. TDH 7 bar, Capacity 10,700 GPM
  • Isolating Valves: 422 nos. up to 1,050 mm dia.
  • Chilled Water Piping: 6,000 m total
  • Transformers Dry Type: 6 nos. Capacity 13.8 / 0.38 kV
  • Motor Control Centers (MCC)
  • Area Lighting
  • Panel Boards
  • Grounding and Lightning Protection

Infrastructure in Girls Colleges in Al Rayyan Complex in Dammam

Project Description

MEP Contractor FEMCO & YUKSEL Consortium
Location Dammam, KSA
End User Ministry of Higher Education
Client University of Dammam
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 349.92 Million Saudi Riyal
Start Date June, 2013
Finish Date Apr, 2017
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical & Electrical Infrastructure Works, Project is divided to two stages, Package 1 & 2.

Scope of Work

  • Excavation & Backfilling: 115,000 m³ & 52,000 m³
  • Service Tunnel: 5,500 m
  • Chilled Water Piping System: 11,000 m
  • Storm Water Piping System: 4,500 m
  • Sewage Water Piping System: 4,000 m
  • Potable Water Piping System: 9,000 m
  • Domestic Water Piping System: 9,000 m
  • Irrigation Water Piping System: 66,000 m
  • Fire Water Piping System: 10,500 m
  • Data, Voice, CCTV, Public Address, Fire Alarm Networks: 4,200m x 5 = 21,000 m
  • MV Distribution Network: 29,000 m
  • LV Distribution Network: 19,000 m
  • Water Storage Tanks
  • Fire & Domestic Water Tank: 1 no. Capacity 5,304 m³
  • Potable Water Tank: 1 no. Capacity 2,673 m³
  • Irrigation Water Tank: 1 no. Capacity 2,460 m³
  • Raw Water Tank: 1 no. Capacity 550 m³
  • Pump Rooms
  • Domestic Water Pump Room: 3 nos. TDH 6.5 bar, Capacity 555 GPM
  • Fire Water Pump Room: 2 nos. TDH 13 bar, Capacity 1250 GPM
  • Irrigation Water Pump Room: 1 no. TDH 7 bar, Capacity 397 GPM
  • Potable Water Pump Room: 3 nos. TDH 7.5 bar, Capacity 365 GPM
  • Chiller Plant
  • Water Cooled Centrifugal Chiller: 6 nos. Capacity 2,946 TR each (TOTAL 17,676 TR)
  • Closed Circuit Cooling Towers: 5 nos.
  • Chilled & Condenser Water Pumps
  • MV Switchgears
  • Transformers
  • Motor Control Centres

Furnish, Install, Test & Commissioning of Water Cooled Centrifugal Chillers and Vapor Absorption Chillers in AC Station

Project Description

MEP Contractor Faisal Electro-Mechanical Co. Ltd.
Location Dhahran, KSA
End User Ministry of Higher Education
Client King Fahd University of Petroleum and Minerals
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 9.05 Million Saudi Riyal
Start Date May, 2013
Finish Date Nov, 2014
Total Land Area
Total Built-up Area

Work Description

Mechanical Replacement Works

Scope of Work

  • Supply, Installation and Testing & Commissioning of 4 nos. Water Cooled Centrifugal Chillers 550 TR capacity each (TOTAL 2,200 TR)
  • Supply, Installation and Testing & Commissioning of 1 no. Water Cooled Centrifugal Chiller 750 TR capacity.
  • Supply, Installation and Testing & Commissioning of 2 nos. Fire Absorption Liquid Chillers 200 TR capacity each (TOTAL 400 TR).
  • Supply, Installation and Testing & Commissioning of 2 nos. Fire Absorption Liquid Chillers 250 TR capacity each (TOTAL 500 TR).

Main Chilled Water Piping For Faculty Housing

Project Description

MEP Contractor FEMCO & YUKSEL Consortium
Location Jeddah, KSA
End User Ministry of Higher Education
Client King Abdulaziz University
Project Management University PM
Consultant Fluor Consultants
Type of Project District Cooling & Infrastructure
Total Value (SAR) 43.87 Million Saudi Riyal
Start Date May, 2013
Finish Date Jan, 2014
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical, & Electrical Infrastructure Works

Scope of Work

  • Supply and installation Chilled water pipilines. Pre-insulated pipes. 750, 600, 450, 400, 350, 300 mm diameter pipes total 7950 meter.
  • Supply and installation Packaged ETS Plant; Stainless Steel Double Plate Heat Exchanger, Structural Steel Base, Insulated Double Wall Plant Enclosure, Pumps, Motors and controllers including VFD Drive, Air Separator and Make-Up Water System, Expansion Tank, Chemical Treatment Systems and Chemical Pot Feeder, Valves, Gauges and Piping Accessories, Pipe and Pipe Supports, Pump Vibration Isolation. Electrical Equipments within Packaged ETS plant. DDC Control System with remote workstation Interface Panel. (7 nos. ETS Module. a- 1897Tons (6671.75Kw), b- 2520Tons (8862.84Kw), c- 3010Tons (10586.2Kw), d- 1964Tons (6907.4Kw), e- 2464Tons (8665.89Kw), f- 840Tons (2954.3Kw), g- 1768Tons (6218.1Kw), flanged ends.)