Design, Construction and Fit-Out of the DGDA Site Offices

Project Description

Contractor FEMCO & SASEL CONSORTIUM
Location Riyadh, KSA
End User Diriyah Gate Development Authority (DGDA)
Client Diriyah Gate Development Authority (DGDA)
Project Management Faithful+Gould
Consultant Khatib & Alami
Type of Project Office Building
Total Value (SAR) 89 Million Saudi Riyal
Start Date Jul, 2019
Finish Date Jun, 2020
Total Land Area 45,000 m2
Total Built-up Area 12,000 m2

Work Description

Infrastructure and Electrical & Mechanical Works

Scope of Work

  • 45,000 m2 Asphalt and 37,000 m2 Parking Area
  • Underground Storm, Sewage, Potable, Irrigation and Fire Water Network
  • Construction of 2-floors Total 12,000 m2 Steel Structure Office Building
  • Construction and Furnishing of 1 No. Main Guard House
  • Supply and Assembly of All Office Furnitures
  • All associated Civil, Architectural and Electro-Mechanical Works

KFU Projects for Parking Lots for Female Employees and Students

Project Description

MEP Contractor Faisal Electro-Mechanical Co. Ltd.
Location Al Ahsa, KSA
End User Ministry of Higher Education
Client King Faisal University
Project Management University PM
Consultant
Type of Project Parking & Landscaping
Total Value (SAR) 5.25 Million Saudi Riyal
Start Date Sep, 2018
Finish Date Jan, 2020
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical & Electrical Infrastructure Works

Scope of Work

  • King Faisal University for parking lots for female employees and students.
  • 31000 M2 Area excavation, backfilling, base-coarse and asphalt.
  • All parking area marking, lighting and water drainage system.
  • Parking Gate building all civil, electrical and mechanical work.

Replacement Works for King Abdulaziz University Female 200

Project Description

MEP Contractor FEMCO & YUKSEL Consortium
Location Jeddah, KSA
End User Ministry of Higher Education
Client King Abdulaziz University
Project Management University PM
Consultant Fluor Consultants
Type of Project District Cooling & Infrastructure
Total Value (SAR) 69.42 Million Saudi Riyal
Start Date Feb, 2014
Finish Date Nov, 2015
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical & Electrical Replacement Works

Scope of Work

  • Handicapping & Landscaping work.
  • Parking area.
  • Asphalt work; 39,000 m².
  • External lighting.
  • Chilled water piping work (6″ to 20“) – 3560 mt.
  • Potable water piping work (50mm to 200mm Dia) – 2365 mt.
  • Sewage water piping work (110mm to 500mm Dia) – 3445 mt.
  • Irrigation system (20mm to 110mm Dia) – 3550 mt.
  • MV cable 400mm² – 14,400 mt.
  • LV cable system.
  • Cable duct bank for MV & LV
  • Compact substation 400 V – 1500 kVA (2 nos) and 1000 kVA (14 nos).
  • Generator 875 kVA (4nos) and 1500 kVA (2nos).
  • Telecommunication system.

P&C for Sea Water Pump Station (201-C01)

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Ras Al Khair, KSA
End User Royal Commission for Jubail and Yanbu
Client Royal Commission for Jubail and Yanbu
Project Management Bechtel
Consultant Bechtel
Type of Project Water & Power
Total Value (SAR) 429.33 Million Saudi Riyal
Start Date Dec, 2013
Finish Date Jul, 2017
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical & Electrical Infrastructure Works. The pumping station shall pump 75.000 m3 / hr sea water to the system network for Ras Al Khair Industrial City when completed.

Scope of Work

Sea Water Cooling Pump Station

  • Vertical Mixed Flow Pump: 4 nos. Capacity 15,000 m³/hr. each (TOTAL 60,000 m³/hr.).
  • Mechanical Bar Screen: 4 nos. Capacity 15,000 m³/hr. Clearing Space between bars 80 mm.
  • Travelling Band Screen: 4 nos. Capacity 15,000 m³/hr. Screening Aperture Size 5×5 mm.
  • FRP/GRP Water Piping including Valves and Fittings: 1,780 m up to 3,300 mm dia.
  • Overhead Crane: 1 no. Lifting Capacity 40 ton.
  • Excavation and Backfilling: 45,000 m³ and 5,000 m³.
  • Concrete: 18,000 m³.

HYPOCHLORITE Generation Building

  • Sodium Hypochlorite Generators: 3 nos. Capacity 540 kVA.
  • Seawater flow through one Generator: 50 m³/hr.
  • Hypochlorite Production: 100 kg/h.
  • Hypochlorite Concentration: 2,000 ppm.
  • Seawater Booster Pump: 2 nos. TDH 1.8 bar Capacity 528 GPM.
  • Automatic Self-Cleaning Filters: 2 nos. Capacity 528 GPM.
  • Sodium Hypochlorite Storage FRP Tank: 2 nos. Capacity 80 m³.
  • SEC 115 kV Power Supply: Including design & engineering works of 115kV cabling system.

Site Development

  • Intake Dredging Works: 200,000 m³ Dredging of intake canal.
  • Shoreline Rip Rap Protection: 9,300 m².
  • Shoreline Interlocking: 1,800 m².
  • Toe-Down to Dredged Channel: 600 m³.
  • Grading: 200,000 m².
  • Surfacing: 5,000 m².
  • Asphalt: 12,000 m²
  • Jelly Fish Basin: Length 100 m, Width 60 m and Depth 2 m.
  • Cofferdam Temporary Works: 60 x 100 m.
  • Staff Control Building
  • Switchgear Building
  • Workshop Building
  • Guard House
  • SEC Building.

Preparation of Infrastructure for the University City in Al-Ahsa, Phase-4 (King Faisal University Permanent Campus in Al-Ahsa)

Project Description

MEP Contractor FEMCO & YUKSEL Consortium
Location Al Ahsa, KSA
End User Ministry of Higher Education
Client King Faisal University
Project Management University PM
Consultant Zuhair Fayez Partnership (ZFP)
Type of Project District Cooling & Infrastructure
Total Value (SAR) 143.07 Million Saudi Riyal
Start Date Mar, 2011
Finish Date Jun, 2013
Total Land Area
Total Built-up Area

Work Description

The Infrastructure Phase-4 Stage–1 A project is located along the Academic Area, East Loop Road, West Loop Road, Road-A, Male’s Dormitory Area, and Female’s Dormitory Area of King Faisal University Campus, Al – Ahsa.

Scope of Work

  • Roads & Street Improvement Works: 285,000 m²
  • Landscape & Hardscape Works: 90,000 m²
  • Sanitary Sewer Piping System: 3,300 m
  • Storm Water Drainage Piping System: 6,500 m
  • Raw Water Piping System: 4,800 m
  • Sweet Water Piping System: 2,600 m
  • Well Water System: 4 nos. deep wells
  • Chilled Water Piping System: 800 m
  • Providing full operation preventive maintenance and overall maintenance for electro-mechanical network systems for campus & around 15 campus buildings.

Infrastructure for Housing of the University City in Dammam – Phase 3

Project Description

MEP Contractor FEMCO & YUKSEL Consortium
Location Dammam, KSA
End User Ministry of Higher Education
Client University of Dammam
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 37 Million Saudi Riyal
Start Date Aug, 2010
Finish Date Aug, 2011
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical, & Electrical Infrastructure Works

Scope of Work

  • The infrastructure works of the Research Center which include 7 building
  • Sewage, storm, raw, fire, chilled water, water tanks.
  • Fire water tanks, RO plant, Pump Room,
  • Transformer and Switchgears,
  • Irrigation and Landscaping of roads and parks.

Research Centers Project – University City – Dammam

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Dammam, KSA
End User Ministry of Higher Education
Client University of Dammam
Project Management
Consultant
Type of Project Building
Total Value (SAR) 21.89 Million Saudi Riyal
Start Date Jun, 2010
Finish Date May, 2012
Total Land Area
Total Built-up Area

Work Description

Civil, Structural and Electro-Mechanical Works

Scope of Work

  • Building of the new campus main gate with 3 secondary gates with all electrical and mechanical works and supply and testing of the security system all around the boundary wall and connecting to the main gate.

Infrastructure for Housing of the University City in Dammam – Phase 2

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Dammam, KSA
End User Ministry of Higher Education
Client University of Dammam
Project Management
Consultant
Type of Project Building
Total Value (SAR) 21.89 Million Saudi Riyal
Start Date Jun, 2010
Finish Date May, 2012
Total Land Area
Total Built-up Area

Work Description

Civil, Structural and Electro-Mechanical Works

Scope of Work

  • Building of the new campus main gate with 3 secondary gates with all electrical and mechanical works and supply and testing of the security system all around the boundary wall and connecting to the main gate.

Education College Buildings in Dammam – Phase 2 – First Part

Project Description

MEP Contractor Faisal Electro-Mechanical Co. Ltd.
Location Dammam, KSA
End User Ministry of Higher Education
Client King Faisal University
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 9.5 Million Saudi Riyal
Start Date Aug, 2009
Finish Date Sep, 2009
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical, & Electrical Infrastructure Works

Scope of Work

  • Including the infrastructure, backfilling,
  • Curbstone, sub-base, base coarse, asphalting,
  • Interlock works of approximate 70,000 m2 road and parking.
  • Building a closed corridor with guard houses between faculty 4.6 m x 400 m.
  • All electrical work, external lighting and internal lighting and plumbing system, sewage network.

Connection Between Colleges and Administration in the University City in Dammam – Phase 1

Project Description

MEP Contractor Faisal Electro-Mechanical Co. Ltd.
Location Dammam, KSA
End User Ministry of Higher Education
Client King Faisal University
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 10.67 Million Saudi Riyal
Start Date Mar, 2009
Finish Date Nov, 2009
Total Land Area
Total Built-up Area

Work Description

Electro-Mechanical & Hardscaping Works

Scope of Work

  • Include ducting work, fire alarm and sprinkler system,
  • Granite pavement,
  • Cladding and all electrical work,
  • Data and telephone & internet network system

for the main hall and the connection between colleges and administration building.