P&C of Sea Water Cooling Supply Piping for Royal Commission at Ras Al-Khair

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Ras Al Khair, KSA
End User Royal Commission for Jubail and Yanbu
Client Royal Commission for Jubail and Yanbu
Project Management
Consultant Bechtel
Type of Project Pipeline
Total Value (SAR) 30.19 Million Saudi Riyal
Start Date May, 2020 (Notice to Proceed)
Finish Date May, 2021
Total Land Area
Total Built-up Area

Work Description

Infrastructure Pipeline

Scope of Work

  • Installation and Testing & Commissioning of 6,000 LM pf 1600 mm dia pipe

Chilled Water Line – SWCC

Project Description

MEP Contractor Faisal Electro-Mechanical Co. Ltd.
Location Jubail, KSA
End User Saline Water Conversion Corporation (SWCC)
Client Saline Water Conversion Corporation (SWCC)
Project Management SWCC-PM
Consultant
Type of Project Water & Power
Total Value (SAR) 5.18 Million Saudi Riyal
Start Date May, 2019
Finish Date Feb, 2020
Total Land Area
Total Built-up Area

Work Description

Civil, Electrical & Mechanical Work

Scope of Work

  • Supply and Installation New GRV Pipes & Fittings
  • Supply and Installation of Power Pack for DN 900 Butterfly valves
  • Fabrication of GRP Pipe supports.
  • Civil Works; Concrete Work for Pipes Foundation, Asphalt Cutting, Excavation  and Back filling work

Infrastructure for the Preparatory Year in Faysaliyah

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Jeddah, KSA
End User Ministry of Higher Education
Client King Abdulaziz University
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 63.8 Million Saudi Riyal
Start Date Nov, 2017
Finish Date May, 2020
Total Land Area
Total Built-up Area

Work Description

Civil, Electrical & Mechanical works

Scope of Work

Work Summary: Infrastructure work for the existing and new building in Al Faysaliyah King Abdulaziz University Campus, work including all civil works and complete electro-mecanical work for chiller plant with mechanical and electrical net works as bellow:

  • Water Cooled Centrifugal Chillers: 11 nos. Capacity 560 TR each (TOTAL 6,160 TR)
  • Chilled Water Primary Pumps: 7 nos. TDH 3 bar, Capacity 2,300 GPM
  • Chilled Water Secondary Pumps: 7 nos. TDH 5 bar, Capacity 1,900 GPM
  • Expansion Tanks: 4 nos. Capacity 900 Gallon
  • Heat Exchangers: 11 nos. 1,750 kW
  • Aboveground and Underground Chilled Water Piping: 3,500 m
  • Sewage Piping System: 2,500 m
  • Potable and Fire Water Piping System: 2,500 m
  • Fire Pumps: 2 nos. TDH 6 bar, Capacity 317 GPM
  • Fire Pump: 1 nos. TDH 8 bar, Capacity 1,000 GPM
  • MV Switchgears: 4 nos. 13.8 kV
  • Transformers: 2 nos. 13.8 / 0.4 kV
  • Emergency Generator: 6 nos. 800 kVA

District Cooling For Community Area Package 1 – Pipeline Distribution Network

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Yanbu, KSA
End User Royal Commission for Jubail and Yanbu
Client Royal Commission for Jubail and Yanbu
Project Management
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 43.98 Million Saudi Riyal
Start Date Oct, 2017
Finish Date Jan, 2021
Total Land Area
Total Built-up Area

Work Description

Civil, Electrical & Mechanical works

Scope of Work

  • Engineering, procurement and construction (EPC).
  • Chilled Water Piping System including valve chambers: 6,000 m.
  • Fibber Optic Cable: 1,500 m.
  • Excavation and Backfilling..

Pipeline for Saline Water Conversion Corporation (SWCC) tank to Royal Commission Tank

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Ras Al Khair, KSA
End User Royal Commission for Jubail and Yanbu
Client Royal Commission for Jubail and Yanbu
Project Management Bechtel
Consultant
Type of Project Water & Power
Total Value (SAR) 18.94 Million Saudi Riyal
Start Date Jun, 2017
Finish Date Jan, 2018
Total Land Area
Total Built-up Area

Work Description

Civil & Mechanical works

Scope of Work

SWCC POTABLE PIPELINE

  • Addition scope was added to project 201-C01 as of Supply, Installation and testing of GRP pressure 1200 mm, 4.8 km from Saline Water Conversion Corporation (SWCC) tank to Royal Commission tank, including all required earth work

Supply, Fabrication & Installation of Chilled Water Pipelines With Insulation at Shuqaiq Plant

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Shuqaiq, KSA
End User Saline Water Conversion Corporation (SWCC)
Client Saline Water Conversion Corporation (SWCC)
Project Management SWCC-PM
Consultant
Type of Project Water & Power
Total Value (SAR) 1.16 Million Saudi Riyal
Start Date May, 2015
Finish Date Feb, 2016
Total Land Area
Total Built-up Area

Work Description

Mechanical works

Scope of Work

  • Supply & Fabricate the Chilled Water Pipelines.
  • It is the actual Routing & Installation of Chilled Water Lines.
  • Insulating them at site with Proper Supports and Tie-in to the existing system.
  • Providing temporary cooling arrangements to individual rooms and in M.C.R

Project of Supplementation of Infrastructure for the University City Third Phase (Lift Station)

Project Description

MEP Contractor FEMCO & Sasel Saudi Consortium
Location Dammam, KSA
End User Ministry of Higher Education
Client University of Dammam
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 19.52 Million Saudi Riyal
Start Date Aug, 2014
Finish Date Mar, 2016
Total Land Area
Total Built-up Area

Work Description

Civil, Electrical, Mechanical and Instrument works.

Scope of Work

  • Gravity Pipeline; Catch Basins for GRP. GRP pipes 400, 600, 700, 800, 900, 1000, 1200mm dia. GRP manholes having 1200, 1500mm dia.
  • Lift Station; Excavation support secant piles.Total 1612m2 wall to be constructed.Tension piles underneath the lift station.Ductile Iron Pipe and fittings to be supplied and installation. Submergible pumps with motor and control panel, vapor barrier membrane, Compartment System waterproofing, ceiling mounted weather proof fluorescent lighting fixture, grounding, MV cables.
  • Force Main Pipeline; Supply and laying and install GRP pipe with Air Release Valve.
  • Electrical Room construction for Generator; Construction of Electrical room for Generator and Package substation, Supply and install the Package Substation and one unit of the Generator with storage fuel tank, Underground FRP fuel, Auto Transfer switch, grounding, MCC and ICP.

Replacement Works for King Abdulaziz University Female 200

Project Description

MEP Contractor FEMCO & YUKSEL Consortium
Location Jeddah, KSA
End User Ministry of Higher Education
Client King Abdulaziz University
Project Management University PM
Consultant Fluor Consultants
Type of Project District Cooling & Infrastructure
Total Value (SAR) 69.42 Million Saudi Riyal
Start Date Feb, 2014
Finish Date Nov, 2015
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical & Electrical Replacement Works

Scope of Work

  • Handicapping & Landscaping work.
  • Parking area.
  • Asphalt work; 39,000 m².
  • External lighting.
  • Chilled water piping work (6″ to 20“) – 3560 mt.
  • Potable water piping work (50mm to 200mm Dia) – 2365 mt.
  • Sewage water piping work (110mm to 500mm Dia) – 3445 mt.
  • Irrigation system (20mm to 110mm Dia) – 3550 mt.
  • MV cable 400mm² – 14,400 mt.
  • LV cable system.
  • Cable duct bank for MV & LV
  • Compact substation 400 V – 1500 kVA (2 nos) and 1000 kVA (14 nos).
  • Generator 875 kVA (4nos) and 1500 kVA (2nos).
  • Telecommunication system.

Main Chilled Water Piping For Faculty Housing

Project Description

MEP Contractor FEMCO & YUKSEL Consortium
Location Jeddah, KSA
End User Ministry of Higher Education
Client King Abdulaziz University
Project Management University PM
Consultant Fluor Consultants
Type of Project District Cooling & Infrastructure
Total Value (SAR) 43.87 Million Saudi Riyal
Start Date May, 2013
Finish Date Jan, 2014
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical, & Electrical Infrastructure Works

Scope of Work

  • Supply and installation Chilled water pipilines. Pre-insulated pipes. 750, 600, 450, 400, 350, 300 mm diameter pipes total 7950 meter.
  • Supply and installation Packaged ETS Plant; Stainless Steel Double Plate Heat Exchanger, Structural Steel Base, Insulated Double Wall Plant Enclosure, Pumps, Motors and controllers including VFD Drive, Air Separator and Make-Up Water System, Expansion Tank, Chemical Treatment Systems and Chemical Pot Feeder, Valves, Gauges and Piping Accessories, Pipe and Pipe Supports, Pump Vibration Isolation. Electrical Equipments within Packaged ETS plant. DDC Control System with remote workstation Interface Panel. (7 nos. ETS Module. a- 1897Tons (6671.75Kw), b- 2520Tons (8862.84Kw), c- 3010Tons (10586.2Kw), d- 1964Tons (6907.4Kw), e- 2464Tons (8665.89Kw), f- 840Tons (2954.3Kw), g- 1768Tons (6218.1Kw), flanged ends.)

Pertaining to Installation of New Steel Pipe for Al Ghat – Buraida Pipeline Ring Road Crossing. SWCC/RQWTS – Al Ghat to Buraida Pipeline

Project Description

Contractor FEMCO & YUKSEL Consortium
Location Al Ghat, Buraidah, KSA
End User Saline Water Conversion Corporation (SWCC)
Client Saline Water Conversion Corporation (SWCC)
Project Management SWCC-PM
Consultant
Type of Project Water & Power
Total Value (SAR) 23.58 Million Saudi Riyal
Start Date Jan, 2012
Finish Date Dec, 2012
Total Land Area
Total Built-up Area

Work Description

Piping works

Scope of Work

  • Installation of 64” Product Carbon Steel Pipes
  • Installation of 80″ Sleeve Carbon Steel Pipes
  • Thrust boring works.
  • FEB & 3 layer coating
  • Cathodic Protection