Design, Construction and Fit-Out of the DGDA Site Offices

Project Description

Contractor FEMCO & SASEL CONSORTIUM
Location Riyadh, KSA
End User Diriyah Gate Development Authority (DGDA)
Client Diriyah Gate Development Authority (DGDA)
Project Management Faithful+Gould
Consultant Khatib & Alami
Type of Project Office Building
Total Value (SAR) 89 Million Saudi Riyal
Start Date Jul, 2019
Finish Date Jun, 2020
Total Land Area 45,000 m2
Total Built-up Area 12,000 m2

Work Description

Infrastructure and Electrical & Mechanical Works

Scope of Work

  • 45,000 m2 Asphalt and 37,000 m2 Parking Area
  • Underground Storm, Sewage, Potable, Irrigation and Fire Water Network
  • Construction of 2-floors Total 12,000 m2 Steel Structure Office Building
  • Construction and Furnishing of 1 No. Main Guard House
  • Supply and Assembly of All Office Furnitures
  • All associated Civil, Architectural and Electro-Mechanical Works

Infrastructure of University City (Phase 3) Rehabilitation of Cooling Towers

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Dammam, KSA
End User Ministry of Higher Education
Client Imam Abdulrahman Bin Faisal University
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 9.25 Million Saudi Riyal
Start Date Apr, 2019
Finish Date Apr, 2020
Total Land Area
Total Built-up Area

Work Description

Civil, Electrical & Mechanical works

Scope of Work

  • Water Cooled Centrifugal Chillers: 3 nos. Capacity 1,300 TR each (TOTAL 3,900 TR)
  • Mechanical Draft Cooling Towers Open Type: 4 nos. Capacity 3,900 GPM
  • Filtration System: 20 nos. Capacity 54 m³/hr
  • Automatic Sand Trap Filters: 20 nos. Rang between 0.35 mm – 1.2 mm
  • Chilled Water Pumps: 3 nos. TDH 7 bar, Capacity 3,900 GPM
  • Condenser Water Pumps: 3 nos. TDH 3.5 bar, Capacity 3,900 GPM
  • Standby Diesel Generator: 1 no. 1,500 kVA

Mechanical Works for Steam Boilers Network in Medical Center

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Jeddah, KSA
End User Ministry of Higher Education
Client King Abdulaziz University
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 8.1 Million Saudi Riyal
Start Date Nov, 2018
Finish Date Nov, 2020
Total Land Area
Total Built-up Area

Work Description

Civil, Electrical & Mechanical works

Scope of Work

  • Renovation of Boiler Building Replacement of doors and windows,
  • Plastering, painting, ceiling and roof insulation system works.
  • Replacement of (3) nos. Diesel type Steam Boiler
  • Supply, installation, testing & Commissioning of (2) nos. Electric type Steam Boilers and (1) no. Gas type Steam Boiler with steam capacity 1.5 ton/hr.
  • Rehabilitation of (2) nos. Steam Pumps.
  • Supply, installation, Testing & Commissioning of AHU & ducting,
  • RO Unit, Water Softener Unit, Pumps, pipe & fittings and valves,
  • Boiler Plant Fire Fighting System,
  • BMS, Main Distribution Board, cable and cable trays.
  • Underground existing High Pressure Steam Line Test (X-RAY and REPLICA)

Pipeline for Saline Water Conversion Corporation (SWCC) tank to Royal Commission Tank

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Ras Al Khair, KSA
End User Royal Commission for Jubail and Yanbu
Client Royal Commission for Jubail and Yanbu
Project Management Bechtel
Consultant
Type of Project Water & Power
Total Value (SAR) 18.94 Million Saudi Riyal
Start Date Jun, 2017
Finish Date Jan, 2018
Total Land Area
Total Built-up Area

Work Description

Civil & Mechanical works

Scope of Work

SWCC POTABLE PIPELINE

  • Addition scope was added to project 201-C01 as of Supply, Installation and testing of GRP pressure 1200 mm, 4.8 km from Saline Water Conversion Corporation (SWCC) tank to Royal Commission tank, including all required earth work

Project of Technology Transfer and Water Purchase Production by SWCC Through Construction of MED-TVC Unit in Shuaiba 2 Desalination Plant

Project Description

Main Contractor ACWA Power SASAKURA (APS)
Sub-Contractor Faisal Electro-Mechanical Co. Ltd.
Location Shuaiba, KSA
End User Saline Water Conversion Corporation (SWCC)
Client Saline Water Conversion Corporation (SWCC)
Project Management SWCC-PM
Consultant
Type of Project Water & Power
Total Value (SAR) 42 Million Saudi Riyal
Start Date Mar, 2017
Finish Date Nov, 2018
Total Land Area
Total Built-up Area

Work Description

Civil, Electrical, Mechanical & Instrumentation Work

Scope of Work

  • The complete package / built-up MED Evaporator Unit (91,200 m³ /day).
  • Package CVL – 02 Civil Works; earthworks, foundations, road works,
  • Construction of Electrical Control & Switchgear Building and Discharge pit etc.
  • Package EMP – 01 Electromechanical erection works, with limited supply items such as insulation for piping materials, support materials etc.

Design, Supply and Construction Of The Pump Station and The Pipe Connecting the Pump Station To the Existing Pipe Strip Tied – In to RQWTS Operating Tank

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Buraidah, KSA
End User Power and Water Utility Co. for Jubail and Yanbu (Marafiq)
Client Power and Water Utility Co. for Jubail and Yanbu (Marafiq)
Project Management
Consultant
Type of Project Water & Power
Total Value (SAR) 6.76 Million Saudi Riyal
Start Date Sep, 2014
Finish Date Mar, 2015
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical, Electrical and Instrument Work

Scope of Work

Pump House

    • Design, Prepare and Excute the Construction Of Pump House Building about 18.6 mts (L) X 13.62 mts(W) X 10.5 mts(H)
    • Construction of LV Switchgear Room in side Pump House Building about 18.6 mts (L) X 13.62 mts(W) X 10.5 mts(H)
    • Supply and Installation of 2.5 Tons Electric Overhead Crane
    • Supply & Installation of 3 nos of Pump w / Motor; Flow rate: 1000m³/h, Head: 40 mts (4 bar)
    • Supply and Installation of Carbon Steel Pipes, Fittings & Flanges for Suction & Discharge Side of Pumps
    • Supply and Installation of Valves for Suction & Discharge Side of Pumps

Valve Chamber

    • Design, Prepare and Excute the Construction Of Flow Control By-Pass Valve Chamber about 8.1 mts (L) X 4.6 mts(W) X 3.85 mts(H)
    • Supply and Installation of Flow Control, Butterfly Valve and Carbon Steel Pipes & Fittings for Valve Chamber

Modification of Bearing Cooling System for the Main Sea Water Pumps in Pump Station 1 & 2 Al-Jubail

Project Description

Contractor Faisal Electro-Mechanical Co. Ltd.
Location Jubail, KSA
End User Power and Water Utility Co. for Jubail and Yanbu (Marafiq)
Client Power and Water Utility Co. for Jubail and Yanbu (Marafiq)
Project Management
Consultant
Type of Project Water & Power
Total Value (SAR) 6.76 Million Saudi Riyal
Start Date Sep, 2014
Finish Date Mar, 2015
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical, Electrical & Instrumentation works

Scope of Work

Engineering Procurement Construction contract for Upgrade & Automation of Bearing cooling system for Main Seawater Pumps.

Pertaining to Installation of New Steel Pipe for Al Ghat – Buraida Pipeline Ring Road Crossing. SWCC/RQWTS – Al Ghat to Buraida Pipeline

Project Description

Contractor FEMCO & YUKSEL Consortium
Location Al Ghat, Buraidah, KSA
End User Saline Water Conversion Corporation (SWCC)
Client Saline Water Conversion Corporation (SWCC)
Project Management SWCC-PM
Consultant
Type of Project Water & Power
Total Value (SAR) 23.58 Million Saudi Riyal
Start Date Jan, 2012
Finish Date Dec, 2012
Total Land Area
Total Built-up Area

Work Description

Piping works

Scope of Work

  • Installation of 64” Product Carbon Steel Pipes
  • Installation of 80″ Sleeve Carbon Steel Pipes
  • Thrust boring works.
  • FEB & 3 layer coating
  • Cathodic Protection

Jeddah SWRO III Project (240 Million Liters Per Day) – WETICO

Project Description

Main Contractor WETICO
Sub-Contractor Faisal Electro-Mechanical Co. Ltd.
Location Jeddah, KSA
End User Saline Water Conversion Corporation (SWCC)
Client WETICO
Project Management SWCC-PM
Consultant
Type of Project Water & Power
Total Value (SAR) 34 Million Saudi Riyal
Start Date Aug, 2011
Finish Date Sep, 2013
Total Land Area
Total Built-up Area

Work Description

Electro-Mechanical Works

Scope of Work

  • RO Trains 1st & 2nd Pass, 254 SMO & 316 L stainless pipes fabrication and erection work
  • RO Trains rack installation
  • Pressure Vassals (4,464 nos.) & Membrane (13,168 nos.) installation works.
  • HP high pressure pump installation.
  • Static mixer, valves, flow metersetc. installation.
  • Flushing and product pumps installation.
  • CIP system, Carrier water system and Calcium Hypoclorite system pumps & erection works.
  • Utilities piping works
  • Electrical & Instrumentation Control system erection works.
  • Grouting works for electro-mechanical activities

Infrastructure for Housing of the University City in Dammam – Phase 3

Project Description

MEP Contractor FEMCO & YUKSEL Consortium
Location Dammam, KSA
End User Ministry of Higher Education
Client University of Dammam
Project Management University PM
Consultant
Type of Project District Cooling & Infrastructure
Total Value (SAR) 37 Million Saudi Riyal
Start Date Aug, 2010
Finish Date Aug, 2011
Total Land Area
Total Built-up Area

Work Description

Civil, Mechanical, & Electrical Infrastructure Works

Scope of Work

  • The infrastructure works of the Research Center which include 7 building
  • Sewage, storm, raw, fire, chilled water, water tanks.
  • Fire water tanks, RO plant, Pump Room,
  • Transformer and Switchgears,
  • Irrigation and Landscaping of roads and parks.